Servimos a toda latinoamérica

Síganos en :

1992

Construction from a Greenfield of a complete palm oil processing facility in the middle of the plantations

DSEC Projects World Map View
Customer

ADAPALM (NIGERIA) LIMITED. Oweri – Imo State – Nigeria

General contractor

De Smet Engineers & Contractors

Scope of works

Design, supply, construction, Installation and commissioning

Industrial operation

1992

De Smet Companies involved

Extraction De Smet, De Smet Rosedowns

Plant capacity
  • Refining : 60 MTPD of olein from RBD
  • Packaging : 4.500 l/hour of olein in 1 lt bottles,
  • 400 jerry cans/hour of 1 gallon
  • Soap : 2.000 kg/hour of laundry soap of 350 gr/piece.
Processing units

Refinery plant :

  • dry pretreatment for degumming,
  • bleaching and filtration plant,
  • continuous oil deodorizing plant,
  • condensing of fatty acids,
  • fractionation plant.
  • Semi-boiled soap manufacturing
  • Manufacture of PVC 1 lt bottles

Conditioning lines :

  • automatic for 4.500 bt of 1 lt/h,
  • semi-auto for 400 jerry cans of 1 USG/h,
  • manual for 60 tins of 18 lt/h and 4.000 drums of 200 lt/h.
Utilities
  • Compressed air system
  • Boiler plant
  • Water distribution
  • Fire fighting equipment
Auxiliaries
  • Laboratory equipment
  • Workshop equipment
  • Palm kernel crushing plant
  • Spare parts
  • All steel structures